- Design Management – value & performance enhancement via value engineering. Cost reduction via material and technology substitutions.
- Identifying Risks – Critical areas, time consuming activities, labour intensive jobs, resource dependent actions, there-by ensuring cost distribution of low and high-risk activities.
- Detailed Program Management – Using tracking tools and software, keeping margins and back up planning for the identified risks, thereby allocating a sundry cost for the back-up in case of high risk actions.
- Human Resource Management – understanding the potential of each team member, allocating tasks and timelines in a customized fashion, thereby optimizing on the overall cost of man-hours required.
- Cost Management – drafting a high-level budget at conceptual stage and aligning it with the resources/funds available. Transitioning this figure into a more detailed budget at the program management level and further breaking it down to the last nail before tendering stage to avoid any surprise costs during construction.
- Procurement Management –Cost negotiations is the key scope here but, it is even more important to manage the timeline and quantity of materials. This avoids material damage for being unused for a long time, cost of storage as well as cost of unused labour in course of delayed deliveries.
- Regular Audits – this includes design audits, quality audits, cost audits and process audits. Possibility of a cost overrun (or even time and scope) can be identified and dealt with at a very early stage, rather than waiting for it to balloon.
- Ethics and Compliance – Ensuring adherence to ethical practices and processes in vendor selection, consultant selection, material procurement, etc. – leads to a robust working system devoid of chances of incapability or under performance, thereby saving cost on rework / revision / replacement.
- Health and Safety – Adherence and conscious observance of health and safety measures, avoids any health hazards / accidents – which in a long term, saves cost on delays and least to mention, damage to the brand’s value.
- Program Management / PMO
- Project Management
- Financial Management
- Risk Management
- Procurement Management
- Contract Management
- Design Management
- Construction Management
- OHSE Management
- Quality Management
- Relocation Management
- Project Monitoring
- Project Audits
- Cost Consultancy
- Workplace Strategy