Ramky Enviro, GHMC Partner for C&D Waste Recycling Facility
<span style="font-weight: 400;">Ramky Enviro Engineers Limited and Greater Hyderabad Municipal Corporation (GHMC) launched its 2nd construction and demolition recycling facility in Hyderabad at Fathullaguda, Hayathnagar. This facility is the first of its kind, which uses wet processing technology to
Published -
Jun 29, 2021 4:38 AM
Ramky Enviro Engineers Limited and Greater Hyderabad Municipal Corporation (GHMC) launched its 2nd construction and demolition recycling facility in Hyderabad at Fathullaguda, Hayathnagar. This facility is the first of its kind, which uses wet processing technology to minimse dust pollution. The plant can process up to 500 TPD of construction and demolition waste. Goutham Reddy, MD & CEO, Ramky Enviro Engineers, said: “Rapid urbanization coupled with the unprecedented growth of cities and towns in the last two decades led to the generation of a lot of C&D waste. Construction and Demolition Waste Management has been our focus in line with our sustainable goals. It is a challenging task to manage C&D waste. The waste material generated during the construction, renovation, and demolition of buildings, roads, and bridges is complex. We have used innovative Wet Process technology to manage the pollution. Ramky is proud to be part of this project which is capable of recycling more than 95% of the incoming debris. I would like to thank the government once again for taking such an initiative towards a sustainable and green city.” K Taraka Rama Rao (Hon’ble Minister for MA&UD, Industries, and IT & C) said: "I am happy to announce that Hyderabad is the first city in South India to have the 2nd construction and demolition facility. We will soon have two more C&D plants coming up in the other locations of the city to cover the entire city with a capacity of 2000 tons per day. It is happy to note that almost all of the waste received at this plant and the earlier constructed plan is converting the debris into good quality construction material.” The plant can process up to 500 TPD of C&D waste with a specialized segregation system, debris handling system, multiple screening systems, material washing, sand washing and water management system. The plant at Fathullaguda is among the largest facilities in South India. The plant will operate under a public-private partnership model with GHMC.Various recycled products from the C&D waste generated at this facility are utilized for non-structural purposes such as footpaths, road sub-base, etc. About 15.26 lakh, MT of C&D waste, has been collected from April 2018, with 7.97 lakh MT collected at the Jeedimetla facility and 5.38 lakh MT collected at Fathullaguda.
Tags : ALLIED Hyderabad construction GHMC Partner Waste Management Greater Hyderabad Municipal Corporation (GHMC) Waste Ramky Enviro C&D Recycling Facility Ramky Enviro Engineers Limited Goutham Reddy K Taraka Rama Rao